Does AIA G702 need to be notarized?
AIA's standard G702 instructions direct the contractor to sign and notarize G702 before submitting it with G703 to the architect. Confirm the edition and any contract modifications.
Under AIA's standard G702 instructions, the contractor signs and notarizes G702 and submits it with G703. G703 ordinarily does not receive separate notarization. Confirm the edition, contract, and architect instructions.
Published and reviewed by iRemoteNotary
Last reviewed August 15, 2026
Generally, the contractor's signature on AIA Document G702 is notarized when the standard G702 workflow applies. AIA's instructions direct the contractor to complete G703, transfer the summary information to G702, sign and notarize G702, and submit both documents to the architect.
G703 is the continuation sheet supporting G702 and ordinarily does not receive a separate notarization merely because it accompanies the application. Confirm the edition, contract modifications, signer, and architect or owner instructions before the session.
AIA G702 and G703 are widely used construction-payment documents, but they perform different functions.
AIA G702 is the Application and Certificate for Payment. The contractor uses it to summarize the requested payment, while the architect uses the certificate portion to certify the amount due.
AIA G703 is the Continuation Sheet. It breaks the contract sum into portions of work and reports scheduled value, completed work, stored materials, retainage, and balance information.
When the standard AIA workflow applies, the contractor signs and notarizes G702 and submits it with the completed G703. The architect's later payment certification is a separate part of the process.
The G702 summary may include:
G703 commonly supports the application with line-item information, including description of work, scheduled value, work completed in prior periods, work completed during the current period, stored materials, total completed and stored, percentage complete, balance to finish, and retainage. The contractor, accountant, project manager, or other authorized preparer supplies these figures. The notary does not calculate or verify them.
| Document | Function | Typical notarization treatment |
|---|---|---|
| G702 | Contractor's payment application and architect's certificate for payment | Contractor's signature is notarized when the standard instructions apply |
| G703 | Continuation sheet with schedule-of-values detail | Ordinarily accompanies G702 without a separate notarial certificate |
| G702S | Contractor-subcontractor payment application variation | AIA instructions call for signing and notarization |
| G702GMP | Guaranteed-maximum-price payment application | AIA instructions call for contractor signature and notarization |
| G732 | Construction-manager-as-adviser payment application | AIA instructions call for signature and notarization |
Always confirm the actual AIA edition and project contract.
AIA's instructions for G702–1992 direct the contractor to:
1. Complete the G703 Continuation Sheet.
2. Transfer the summary information to G702.
3. Sign G702.
4. Have G702 notarized.
5. Submit G702 and G703 to the architect.
The architect then reviews the application and, if acceptable, completes the Architect's Certificate for Payment.
The notary does not complete the architect's certificate and does not certify that payment is due.
Ordinarily, no separate notarization appears on G703 merely because it supports G702.
G703 is the detailed continuation sheet. Its figures feed into the G702 summary. The contractor's certification and notarial certificate appear on G702 under the standard workflow.
However, contract modifications or recipient procedures may require additional signatures or certifications. Confirm the complete payment package before the session.
Do not place a notarial seal on G703 unless it contains a separate authorized notarial certificate or the recipient provides appropriate instructions.
AIA publishes payment forms for different project relationships.
Examples include:
AIA's instructions for several of these forms call for the contractor or subcontractor to sign and notarize the application. Do not assume that every form uses the identical signer, certificate, or supporting sheet.
The contractor-signature section should be executed by the person authorized to sign for the contractor.
That person may be:
The company determines who has authority to sign. The notary verifies the individual's identity but does not grant corporate authority. The signer should use the representative-capacity wording already provided by the form and company instructions.
The notary does not verify:
The notarization applies to the contractor's signature and certification. It is not an audit of the payment application.
A project may incorporate AIA documents but modify:
The contract and recipient instructions control the actual workflow. Do not rely solely on a blank G702 form or generic online explanation. Confirm the edition and project-specific requirements.
Potentially. A contractor may be able to complete the G702 notarization through RON when:
Review the AIA G702 Payment Application Online Notary service page.
Read the progress payment affidavit guide when a separate sworn affidavit is also required.
Read the lien-waiver types guide when lien waivers accompany the application.
Visit the Construction Notary hub for other eligible construction documents.
Confirm whether the recipient requires an original paper G702 before scheduling.
After completing G702 and G703 and confirming the authorized signer, edition, contract requirements, and recipient's RON acceptance, request an online session.
Request G702 NotarizationHave ready:
The notary should not complete blank payment figures or construction calculations.
Under AIA's standard G702 instructions, the contractor signs and notarizes G702 before submitting it with G703 to the architect.
G703 supports the application with detailed schedule-of-values information and is not ordinarily separately notarized.
The notary verifies the signer and completes the notarial certificate. The contractor supplies the payment information, and the architect or other reviewer determines whether to certify payment.
AIA's standard G702 instructions direct the contractor to sign and notarize G702 before submitting it with G703 to the architect. Confirm the edition and any contract modifications.
G703 ordinarily serves as the continuation sheet supporting G702 and does not receive a separate notarization merely because it accompanies the application. Follow project-specific instructions.
A person authorized to sign for the contractor signs the contractor-certification section. The company and project documents determine the authorized representative.
No. The notary does not audit the contract sum, work completed, stored materials, retainage, change orders, prior payments, or current amount due.
Under the standard workflow, the contractor completes, signs, and notarizes the application before submitting it to the architect. The architect then reviews the package and completes the certificate for payment if appropriate.
Possibly. Confirm that the project accepts electronic signatures, RON, and an electronically notarized G702 with its supporting documents.
No. AIA publishes different forms for contractor, subcontractor, guaranteed-maximum-price, and construction-manager workflows. Confirm the exact form and edition.
The following primary sources support the legal and procedural information in this guide. Requirements can change, so confirm current rules with the receiving organization before relying on a notarized document.
AIA Contract Documents
Accessed August 15, 2026
AIA Contract Documents
Accessed August 15, 2026
List of All Current AIA Contract Documents
AIA Contract Documents
Accessed August 15, 2026
AIA Contract Documents
Accessed August 15, 2026
AIA Contract Documents
Accessed August 15, 2026
AIA Contract Documents
Accessed August 15, 2026
Complete the payment package and confirm the signer and recipient requirements before starting your secure session.